皇冠体育官网:Fukushima debris removal delayed by another year

皇冠体育官网www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官方的平台。皇冠体育官网(www.hg108.vip)提供最新皇冠登录,皇冠体育官网包含新皇冠体育代理、会员APP,提供皇冠官网代理开户、皇冠官网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

telegram群组搜索www.tel8.vip)是一个Telegram群组分享平台。telegram群组搜索包括telegram群组搜索、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram群组搜索为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。